Service one
Creek Restoration Plans
A creek restoration plan begins with a reach boundary that everyone agrees on. We mark the upstream and downstream limits, photograph every crossing and record the bed material at fixed intervals, then draw the channel as it is before proposing anything. That first drawing is often the most useful page in the document, because it ends the argument about what the creek looked like before the last storm.
The plan then sets the target condition. For an urban reach this usually means a wider low flow channel, a graded bank at a stable angle and a shaded buffer that can survive a mown lawn next door. For a rural reach the target is often a fenced buffer and a set of riffles that hold gravel through high water. We describe both conditions in the same measured terms so a crew can compare the cost of each option.
The build order is the part clients read first. It breaks the work into phases that can each be funded and finished in one season, with a note on what happens if phase two waits a year. A plan that cannot be paused is a plan that cannot be approved, so we always leave the channel in a stable state at the end of every phase.